Investing in your City: Upgrades to Burlington's Roads

Our weekly "Investing in your City" series continues, highlighting  some of the significant investments being made in Burlington and that our community will benefit from.

•                    •                    •

The City is investing in major improvements to our local roads, bridges and pathways with more than 20 planned upgrades and projects to roadways and road infrastructure in 2024 and several more over the next few years. It's important to note that the forecast projects (2025-2026) are subject to change based on the annual review of the Capital Budget.

2024 Planned Roadway Upgrades:

Project/Location Description
Guelph Line, from Lakeshore Road to St. Clair Avenue Guelph Line renewal
Walkers Line, Ironstone Drive & Britannia Road Culvert repairs
Bromley Road, including Brewer Court, Broughton Crescent, Verhoeven Road, Linwood Crescent & Maureen Court Bromley Road reconstruction
Havendale Boulevard, from Brant Street to Sitwell Court Havendale Boulevard renewal
Mainway, from Guelph Line to Burloak Drive Mainway resurfacing (design in 2024)
Prospect Street to Dynes Road; Brant Street to Cumberland Avenue; Dynes Road; Regency Court; Graham's Lane; & Legion Road Resurfacing
Upper Middle Road Upper Middle Road renewal (design in 2024)
Asset Management Plan Legislated review
Downtown Streetscape Infrastructure Renewal - provides for improvements/replacements for accessibility, pedestrian crossings, transit stops, trees, lighting, public art, and public furnishings
Storm Drainage Video assessment & renewal
Downtown Parking Lot Renewal
Downtown Parking Needs Assessment Study Study will identify long-term parking needs
Parking Garage Health & Safety Mitigation Installation of barriers
Parking Garage Repair/renewal
Downtown Parking Pay Stations Repair/renewal
Parking Standards Review Update Ongoing field surveys to determine parking demand & utilization for various land uses
Sidewalks Rehabilitation & renewal
Streetlights Replacements
Annual Traffic Studies Study & installation of traffic calming measures
Traffic Operational Improvements Lane reconfigurations, curb cuts, pavement marking, & island modifications
Traffic Signals, Intersections, Crossings Installation of new traffic signals, intersection pedestrian signals, & pedestrian crossovers
Traffic Signals Renewals
Bus Stops Upgrades & maintenance

2025 Forecasted Roadway Upgrades:

Project/Location Description
Plains Road West (Shadeland Avenue - Waterdown Road) Renewal Arterial Resurfacing
Walker's Line (North Service Road - Mainway) Resurfacing Arterial Road Resurfacing
Walker's Line (Lakeshore Road - Fairview Street) Resurfacing Arterial Road Resurfacing
New Street Bridge Rehabilitation at Shoreacres Creek Bridge Rehabilitation
Britannia Road Culvert Replacement at Bronte Creek Culvert Replacement
Ontario Street Culvert Replacement Culvert Replacement
Blair Road and Landmark Road Minor Reconstruction Minor Reconstruction
Lakeshore Road (Appleby Line - Burloak Drive) Resurfacing & Multi-Use Pathway Renewal Road & Multi-Use Path Resurfacing
Park Avenue Area Renewal - Phase 2 Road Renewal
Walker's Line (Fairview Street - QEW Interchange) Road Renewal

2026 Forecasted Roadway Upgrades:

Project/Location Description
Fairview Street (Walker's Line - Appleby Line) Resurfacing Arterial Road Resurfacing
Cedar Springs Road (No. 2 Side Road - Britannia Road) Resurfacing Arterial Road Resurfacing
Mainway Culvert at Tuck Creek Replacement Culvert Replacement
No. 8 Side Road at Bronte Creek Culvert Replacement
Upper Middle Road (Guelph Line - 407 ETR Crossing) Renewal Road Renewal
Snake Road (Old York Road - City Limit) Renewal Road Renewal
Linmouth Terrace & Faversham Avenue Road Renewal Road Renewal
Mainway (Guelph Line - Walker's Line) Road Resurfacing

•                    •                    •

RELATED LINKS:

Previous
Previous

Burlington Arts & Culture Fund Supports 18 Local Projects

Next
Next

Mayor’s Monday Mailbag – April 8, 2024 – What Happened to the Pickleball Pilot at Ireland Park?